February 2019   
SUN MON TUE WED THU FRI SAT
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 1 2

March 2019
SUN MON TUE WED THU FRI SAT
24 25 26 27 28 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30








February 22, 2019 Schedule

 
 

7.5 Mile Test Track

 
 
 TimeFacilityStatusComments
  15:00 - 16:30 7.5 Mile Test TrackExclusive 

Vehicle Dynamics Area (VDA)

 
 
 TimeFacilityStatusComments
  14:30 - 16:30 Vehicle Dynamics Area (VDA)Exclusive 
  08:00 - 14:30 Vehicle Dynamics Area (VDA) - WestsideExclusive 

Noise Vibration & Harshness (NVH)

 
 
 TimeFacilityStatusComments
  00:00 - 23:59 Noise Vibration & Harshness (NVH)ExclusiveBlock Time

Dynamic Handling Course (DHC)

 
 
 TimeFacilityStatusComments
  13:00 - 18:00 Dynamic Handling Course (DHC)ExclusiveBlock Time


Facilities With Restrictions

 
 
  Facility Status
7.5 Mile Test Track - Speed Restrictions
All lanes in the straights open. Third lane closed in the curves.
Top of 80mph
7.5 Mile Test Track - 3rd Lane Curves
All lanes in the straights open. Third lane closed in the curves.
Light Snow Cover and Ice
Vehicle Dynamics Area (VDA) - Eastside
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Light Snow Cover and Ice
Vehicle Dynamics Area (VDA) - Westside
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Light Snow Cover and Ice
Vehicle Dynamics Area (VDA) - Basalt
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Snow Covered
Vehicle Dynamics Area (VDA) - Jennite
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Snow Covered
Vehicle Dynamics Area (VDA) - Noise Pad Area
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Snow Covered
Vehicle Dynamics Area (VDA) - Calibration Pads
Basalt requires 35* and pre schedule. Water for basalt has been winterized and will require Water truck. Jennite requires pre schedule for facility and water truck.
Snow Covered
Skid Pad - Wind Generators
Snow Covered
Winding Road Course (WRC) - WRC Sprinkler Section
Sprinkler system closed for winter. Requires 35* and pre schedule for water truck WRC Hydroplane (flat) surface has been modified to specific customer request. Tile circle closed until further notice. Wet asphalt circle is open, but no water.
Closed for Weather
Dynamic Handling Course (DHC) - Dynamic Handling Course (DHC)
Light Snow Cover and Ice
Brake Testing Courses - Brake Soak
Closed for Weather
Mud Pit - #1
Closed for Weather
Mud Pit - #2
Closed for Weather
Mud Pit - #3
Closed for Weather
Paved & Gravel Hilly Road Courses - Gravel Loop
Wooded loop near 23% grade is closed due to washed out areas from flooding.
Patchy Ice
Paved & Gravel Hilly Road Courses - 10% Slope
Wooded loop near 23% grade is closed due to washed out areas from flooding.
Snow Covered
Paved & Gravel Hilly Road Courses - 23% Slope
Wooded loop near 23% grade is closed due to washed out areas from flooding.
Snow Covered
Paved & Gravel Hilly Road Courses - LEVEL
Wooded loop near 23% grade is closed due to washed out areas from flooding.
Snow Covered
Other Facilities - Anti-Lock Brake System Roads (ABS)
Closed for Maintenance
Gravel Road Courses - Gravel Road Course #3
Gravel road 3 closed until at least 8am on Monday 3/25/19.
Closed for Maintenance
Off-Road Courses - Off-Road Durability
Snow Covered
Off-Road Courses - Rock Courses
Snow Covered
Off-Road Courses - Sand Pit
Snow Covered
Off-Road Courses - Off-Road Mobility
Snow Covered
Corrosion Courses - Salt Bath
Closed for Weather
Corrosion Courses - Splash Road
Closed for Weather
ATV Courses - ATV Dynamics Course
Snow Covered
ATV Courses - ATV Woods Course
Snow Covered
ATV Courses - ATV On Property Courses
Snow Covered
Watershock - Course on VDA
Requires pre schedule/temp 35* to operate.
Snow Covered
Watershock - Course by Corrosion Facilities
Requires pre schedule/temp 35* to operate.
Snow Covered